Moorabool Weir Design Concepts

Batesford Weir site, Moorabool River

Blue line to represent concrete to be removed

This site will involve:

  • Modification of the concrete control [represented in blue above] down to match the river bed level.
  • Removal of the v-shaped crest as well as 2/3 of the concrete slab.
  • Removal to occur between October to November 2026 - weather dependant.
  • Water gauging station will remain to continue gauging the range of flows, ensuring historical data set will remain ongoing.
  • Recalibration of gauging station based on the change control level, prior to summer.
  • New gauging station to be purchased through the project for installation further upstream.

Contact Us

Colac Office

64 Dennis Street, Colac VIC 3250
PO Box 159, Colac, VIC 3250
Open to the public: 8.30am - 4pm,  Mon to Wed only
Staff are available Monday to Friday during business hours

T: 1800 002 262
E: info@ccma.vic.gov.au

Geelong office

BARWON WATER OFFICES
Hours: 8:30am – 5pm, Monday to Friday
All mail must be sent via our Colac office
PO Box 159, Colac, VIC 3250

T: 1800 002 262
E: info@ccma.vic.gov.au